(+86)29-6361 0799

About Us

You are here: Home » News
Once cooperation, 
no worry about after-sales.

furnace butt welded pipe

The articles shown below are all about the furnace butt welded pipe, through these related articles, you can get relevant information, notes in use, or latest trends about the furnace butt welded pipe. We hope these news will give you the help you need. And if these furnace butt welded pipe articles can't solve your needs, you can contact us for relevant information.
  • [Industry News] Submerged arc welded pipes VS high frequency welding

    The difference between submerged arc welding and high frequency welding1. Submerged arc weldingSubmerged arc welding is a method in which the arc burns under the flux layer for welding. The welding arc burns between the welding wire and the weldment. The heat of the arc melts the base metal and flux

  • [Industry News] Welded steel pipe--how to ensure and improve welding quality

    At the end of the pre-welded steel pipe (1) before milling, weld the pilot arc plate (2) to find a pilot arc plate with the same thickness as the base material. The distance between the roller and the cutter head should not be too narrow. Later, you will have to apply force laterally) (3) Method of

WX20200430-1444172x
Phone:+86-29-63610799
WX20200430-1456132x
Address: Building B,Greenland SOHO,Xi'an,China

Products List

Quick Links

Follow Us

Contact us
Copyright 2020 GK STEEL PIPE Co., Ltd.