(+86)29-6361 0799

About Us

You are here: Home » News
Once cooperation, 
no worry about after-sales.

seamless wrought steel pipe factory

The articles shown below are all about the seamless wrought steel pipe factory, through these related articles, you can get relevant information, notes in use, or latest trends about the seamless wrought steel pipe factory. We hope these news will give you the help you need. And if these seamless wrought steel pipe factory articles can't solve your needs, you can contact us for relevant information.
  • [Industry News] How seamless steel pipes are produced

    ①Main production process of hot-rolled seamless steel pipe (main inspection process):Tube billet preparation and inspection → tube billet heating → perforation → pipe rolling → steel pipe reheating → fixed (reduced) diameter → heat treatment △ → finished pipe straightening → finishing → inspection (

  • [Industry News] What preparations need to be done before installing steel pipes?

    Before installing the steel pipe, the trench needs to be dug, and the soil dug after the trench has a reasonable stacking place, the excavated earth should be transported to the outside in time, and should not be too close to the trench, there must be two The distance above the meter, so as not to a

WX20200430-1444172x
Phone:+86-29-63610799
WX20200430-1456132x
Address: Building B,Greenland SOHO,Xi'an,China

Products List

Quick Links

Follow Us

Contact us
Copyright 2020 GK STEEL PIPE Co., Ltd.